24th January 2011

More electrical and plumbing

Not much to look at, so not many photos today.  Ran more wires and tubes, including the wires for the stick functions, and mounted a terminal block for the nav/strobe lights.  The power will feed to this block, then run to the wingtips and tail…this makes it so that only 1 cable needs to pass through the spar, rather than 3.

Hours: 4.2 | Posted in Electrical, Plumbing | Comments Off