1st July 2007

TC visit, HS & VS are done!

Started out the afternoon with a visit from EAA Tech Counselor Mike Hilger, who was gracious enough to drive all the way out here and then refuse to accept any gas money.  He reviewed the progress I had made so far: the horizontal & vertical stabilizers, as well as the rudder parts I’d started on.  My riveting turned out to be alright, and he answered some questions that I had about scratches, dings, and primer spraying.  He looked at my broken rudder counterbalance rib and said that if I cleaned up the edges of the area I removed (due to having cracked it when fluting), it would be fine.  We also discussed tools, and techniques for back-riveting/double-flush rivets.  He recommended that I call him for another inspection during the assembly of the wing skeleton; and he’d be happy to come out and help with the closing of the empennage TE’s if needed.

After Mike had gone, I addressed some of the touch-up work he recommended, like removing some dings from the HS spar edges…they happened while squeezing in that slightly cramped inner rib/spar/attach angle area.  I also dabbed some touch-up primer over some spots inside where my bucking bar had scratched the primer.  One last check inside the assembly for forgotten clecoes, tools, spare rivets, etc, and some compressed air to clean out the dust & metal shavings, and the rear spars were clecoed on.  I pulled the pop rivets for the spar-rib attach, and squeezed all the rest.  Allison used her nimble little fingers to place the rivets in the dimples, working ahead of me with the squeezer.  I bolted on the center elevator hinge, but didn’t torque it since I don’t have an in-lb torque wrench that is good for such a low torque range.  With that, the HS & VS are officially done.

Parts laid out for inspection HS sporting rear spar clecoes Stabilizers are finished

[Note: this is the first entry that's being counted in multiple categories, rather than making a separate post for the work in each category.  When the time gets added up in the category menu, it will count the entire time in each category, but only once in the "Total Hours" line; so while the individual category will end up slightly inflated, the total count will be accurate.  Kudos to Dave Parsons (RV-7A) who wrote the WordPress plugins that allow the display of hours worked.]

Hours: 2.1 | Posted in Horiz. Stabilizer, Vert. Stabilizer | Comments Off

26th June 2007

VS essentially done

Finished up riveting the vertical stabilizer this afternoon; like the HS, the rear spar has been left off at this time to allow for inspection when I get ahold of a Tech Counselor.  (I admit, I haven’t done anything beyond send an email…)  Riveting went smoothly following lessons learned on the HS, and didn’t take long at all–there’s not nearly as much here to rivet.  Ended up with one small smile on the skin, but nothing I’m going to worry about.

I couldn’t resist setting the VS atop the HS on the bench and snapping a picture.  Too cool…can’t wait to get the wings on order.  Once I have a steady income again!

VS skeleton ready to rivet VS skin clecoed on VS & HS ready for inspection...starting to look like airplane parts.

Also finished up my required solo hours this morning, though I expect to put in a couple more practicing for the checkride.  My ground ref stuff has improved; I found that if I don’t worry about holding altitude, I can hold it much better.  Go figure.  :P   I was actually surprised how well it went the last time, considering I haven’t done any of those maneuvers for months…

Hours: 1.7 | Posted in Vert. Stabilizer | Comments Off

25th June 2007

Priming is so…riveting!

Started out the day by priming the VS parts.  The discovery for today is that rinsing the etch chemical off the parts using water from the garden hose is a no-no.  (I was trying to keep the parts out of the shower at Allison’s request :) ).  We have much iron in our water, and it created blackish spots on the parts where it had dried.  They didn’t come off by just rubbing, or with acetone, so I decided to re-scrub them with the etch, in case the iron was a corrosion possibility.  Rinsed them in the shower (the water in the house is softened & filtered, whereas the hose water is tee-d off the line straight from the well), and no problems.  I set them out on the priming table and put my big utility fan blowing at them to speed the process.

Everything looked good with that done, so after lunch I shot them with primer, as well as swabbed primer in the holes of the steel hinge brackets.  Allowing some time for it all to dry, we riveted the rear spar after dinner.  That squeezer does an awesome job, and I’m glad I sprang for the longeron yoke.  I expect that riveting the rest of the assembly will go smoothly…most of it’s squeezable, too.  I’m starting to read build logs of rudder assembly.

 VS parts primed VS skin primed internally VS spar rivets

Came in after the spar to do some flight planning for my scheduled night X-C tomorrow…not sure if it will go because of weather (forecast is for clouds & rain, and stiff winds), but if tomorrow turns out like tonight, it will be gorgeous.  I’m also going to ask for the knowledge test signoff and see if I can get that done this week; my computer tests (software from checkride.com) have been going well.

Hours: 2.7 | Posted in Vert. Stabilizer | Comments Off

24th June 2007

VS priming prep

Good day today; I keep wonderin what I’ve missed on the vertical stab because it’s coming together so fast.  Countersunk, dimpled, and deburred as appropriate on the various parts today, as well as edge-finishing the skin.  At the lower spar section where the rivets need to be flush on the forward side (the attach point to the fuselage), I dimpled the spar with the pneumatic squeezer and countersunk the doubler to receive the dimples.  I also dimpled the spars at the skin-spar rivets, rather than countersinking as was done on the HS spars–because the VS spars are made of thinner stock (.032″).  This is acceptable to dimple, according to the book, and test pieces nested find.  The only countersinks in this assembly are on the spar doubler.

Followed that up with an etching session, rinsed and left the parts to dry overnight.  Tomorrow morning I’ll prime if the weather is decent (clear sky at the moment).

VS spar dimpling & countersinks VS parts etched and drying

First project visitor today; a fellow from church, sings in my choir, and an ATC manager.  He’d heard through the grapevine that I am working on my PPL and we got to chatting after church about related things.  He ended up stopping by after the service for a quick look at the project, then we went out to the airport (KRGK) for a flight around the local area in his recently purchased Bonanza.  Nice plane, and a nice day to fly–a scattered layer around 4000′ MSL, good visibility, and calm & clear above the clouds. 

This was Allison’s first time in a small plane, and she seems to have enjoyed it.  She handled the turbulence better than I expected, and her only complaint was the noise level (not too worried about that, something that can be addressed with the headset technology available today).  I had the chance to wear a pair of David Clark ANR headsets, much more comfortable and quiet than the loaner headsets at the FBO where I train…and I found out after we’d landed that they weren’t even turned on!

Hours: 3.6 | Posted in Vert. Stabilizer | Comments Off

23rd June 2007

VS drilling & finishing

Assembled the VS skeleton & skin tonight.  At first it didn’t look like things were going to line up (and I was wondering what I goofed up), but as I worked down the line of holes, everything fell into place.  I think the blue plastic on the spars was making things a bit tight in some places.  I did trim the nose of the top rib slightly–just put an angle on the front of the tabs at the forward part; it didn’t want to fit, even with serious nose fluting, because the leading edge of the skin continues to taper inwards above the rib.  I have seen a number of other logs where this was done, with no problems.  Edge distance on the front skin-spar rivet is still ok, and everything fits nicely.

With everything clecoed together, it was a simple job to match-drill the skin.  Edge-finished the spars and doubler after disassembling the assembly; the ribs were done the other night.  Should be a short few steps from here to priming & assembly.

HS clecoed Upper VS rib nose section Apart for finishing

I’ve also left an email for a local Tech Counselor, hoping to get another set of eyes to look over my HS riveting and check my skill!

Hours: 2.5 | Posted in Vert. Stabilizer | Comments Off

22nd June 2007

Beginnings of a VS

Today was errands day at our house, so we spent much of the day running about the cities (well, the suburbs really, but..) in search of this or that.  In the evening, I carved out some time to start the vertical stabilizer.

Laid out all the parts and clecoed the rear spar, doubler, and hinge brackets together per the plans, and match drilled.  The bottom set of brackets needs to have two holes per piece drilled through the bracket to match the spar.  The two holes on the ultimate bottom bracket have their the size and position set according to what version you’re building: tailwheel or nosewheel.  These holes are drilled through all three pieces in the assembly.  The plans/instructions indicate that these holes are drilled in assembly with the fuselage, but this, according to some other build logs, is only the case for the tailwheel model.  I cross-checked DWG 27A, and it indicated that the bottom holes for the -A model are an extension of the rivet sequence already there, and are not connected to the fuselage.  Another builder had written the factory and asked about this, and was told to go ahead and drill/rivet these lower holes during the VS build.  (The above, of course, is mostly for my recollection, in three years when I get to the point of mounting the VS and the instructions say to drill these holes, and…wait…they’re already riveted!  What happened?)  I drilled the holes.

Deburred and fluted the VS ribs too, and smoothed out a few scratches on those pieces.