More electrical and plumbing
Hours: 4.2 | Posted in Electrical, PlumbingNot much to look at, so not many photos today. Ran more wires and tubes, including the wires for the stick functions, and mounted a terminal block for the nav/strobe lights. The power will feed to this block, then run to the wingtips and tail…this makes it so that only 1 cable needs to pass through the spar, rather than 3.