Still deburring
Countersunk the main longerons, and deburred all the drilled holes in the side skins.
Crossed the 700 hour mark tonight, as well.
Hours: 3.3 | Posted in Forward Fuselage | Comments Off
Countersunk the main longerons, and deburred all the drilled holes in the side skins.
Crossed the 700 hour mark tonight, as well.
Hours: 3.3 | Posted in Forward Fuselage | Comments Off
Deburred and dimpled the tailcone assembly and center fuselage section; installed the three nutplates on the outboard seat ribs. Deburred the main longerons and marked them for countersinking.
And, received a package from England in the mail today — the Andair fuel pump and filter kit I bought on the VAF group buy has arrived. Looks to be a solid piece of kit.
Hours: 2.2 | Posted in Forward Fuselage | Comments Off
The deburring continues…lots of scotchbrite, filing, countersinking, and hole deburring. Good progress on the pile of parts, but the longerons and tailcone remain, as do the side skins. I’ll also have to pull the seat pans off to deburr the inside of the outermost seat ribs, which were match-drilled from the side skins.
Hours: 6.7 | Posted in Forward Fuselage | Comments Off
Finished up the list of remaining tasks on the fuselage: drilled the ends of the floor stiffeners to the firewall & center section angles, filed the gear socket hole cutouts into the center section, cut the holes in the wing root area for the fuel & electrical pass-thrus, fit the baggage wall structure and side panels, and match-drilled any holes that hadn’t previously been done.
With all that done, it was time to take the fuselage apart once more for the deburr/dimple/prime dance. I think taking apart the brake pedals took nearly as long as the whole fuselage–and I only put in half the bolts! I deburred all the solid angle pieces, the small parts, and some of the complicated stuff (ie, anything with tabs and flanges and little bits that need filing and can’t be done with the scotchbrite wheel…). Tomorrow I can hopefully finish up the rest of the deburring; there’s oodles of countersinking to be done as well. It’ll be several weeks now before I can get back to the project for longer than an hour or maybe two.
Hours: 7.1 | Posted in Forward Fuselage | Comments Off
Started off a day in the shop by finishing up the install of the gear webs and associated brackets & spacers. This seems to be a common area to remake parts, so I studied some other build logs carefully last night, and I believe I got it right, without having to remake any parts. I have not, however, yet located the 426AD3-8 rivets called out — the longest I have in my rivet organizer are -6. So, there’s a search in need of doing.
Moving right along, I set out to build the rudder/brake assembly. I’d previously purchased a couple sets of Jim Wright‘s die-cast brake pedals (I am installing dual brakes), and last week I ordered some hardware from McMaster-Carr to install them. I went with stainless hex-head cap screws, but I had to guess at the length–I ordered 5/8″, but it turns out them could have been 1/2″. Something to add to the list for a future order, since they’ll be an easy swap. I also ordered some Oilite bushings for the pedal pivots (p/n 6338K331), along with springs, nylon bushings, and set-screw collars for the brake return springs which are a common mod. (Smitty has the parts list, which I used, and it worked out perfectly.) From Aircraft Spruce, I ordered four AN3-56 bolts, another recommended mod for the brake pedals…those bolts are pricey! I aligned everything with clamps, clamping the whole rudder pedal assembly to the bottom of the workbench, then drilled the brake cylinders to the pedals. With the oilite bushings press-fit into holes in the pedals, the long bolts, and the return springs on the cylinders, the pedals seem to have a nice smooth action.
Next, the whole built-up assembly is fit to the fuselage. This sounds easy, but actually requires either a large angle drill, or removal of the auxiliary longerons to which the pedal pivot blocks attach. I chose to remove the longerons, one side at a time, for drilling–after marking the 3″ setback from the firewall. A scrap piece of angle, match-drilled from the UHMW pivot blocks, served as a drill guide. I put in 3 sets of holes — one at the forwardmost location (3″ from the firewall), one which is 3 1/4″ aft of that (so the aft hole becomes the forward hole), and one in the middle of those two. I’m an average-size guy, so I fit them up in the middle set of holes for now.
The last step is adding the center brace. I deburred this piece and cut the relief on the forward side, then clamped it in place and drilled it to the firewall. Marked the location of the pivot block, then removed and drilled. This is a mental exercise, as the hole distance on the bolts for the center pivot is 3″, where the side blocks are 3 1/4″…I failed the test when marking the holes for the forwardmost and rearmost positions, and ended up with slotted holes in those positions. Doesn’t seem like that should be a problem, and if it is, it’s an easy piece to replace. Seeing this assembly in the fuselage was rewarding–the first moving parts on the fuselage. It’s sort of like the moment where you bolt the rudder to the VS for the first time in the empennage build…moving parts are exciting.
Ten pieces left to install (floor stiffeners, and baggage compartment bits) before everything comes apart for oodles of deburring.
Hours: 10.1 | Posted in Forward Fuselage | Comments Off
Finished the gear socket holes in the bottom skin. Fit and installed the 902 side bulkheads, and fit the gear attach webs that fit over them. Cut the reinforcing strips that go between the side skin and the gear attach webs and deburred the edges.
Hours: 2.8 | Posted in Forward Fuselage | Comments Off
Snowblowing and a batch of last-minute CD’s to copy mean not much time for the project tonight. I used Allison’s tracings to mark the oval holes in the bottom skin where the gear leg sockets pass through, then roughed out the holes with a unibit and file. Next time, I’ll take them out to the cut line and smooth them with the scotchbrite wheel.
Hours: 0.3 | Posted in Forward Fuselage | Comments Off
Fabricated the lower firewall-to-longeron gussets, which are made from a pre-cut piece, but have a series of holes which must be drilled, a relief cut, and two bends made. Clamped and drilled these in position, then drilled the lower longerons to the gusset, firewall weldment, and side skin. Need to read ahead and see whether the #40 holes at the aft end of the longeron (in the gear tower area) are drilled for their final fasteners now, or if they’re just drilled to #40 for the time being.
While I did that, Allison took on an art project and traced two copies of the gear leg cutout template.
Hours: 2.5 | Posted in Forward Fuselage | Comments Off
Continued work on the forward fuselage today, fabricating the angle clips which attach the side skin stiffeners to the firewall, drilling said stiffeners, then fabricating and drilling the lower longerons. These require a section of one leg of the angle to be cut away, then twisted to match the fuselage. Several rounds of clamps, measuring, and test-and-try-again have things fitting well. Once fit, the four bolt holes attaching the longeron to the lower firewall weldment are drilled.
Hours: 3.4 | Posted in Forward Fuselage | Comments Off
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| « Nov | ||||||
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 14 | 15 | 16 | 17 | 18 | 19 | 20 |
| 21 | 22 | 23 | 24 | 25 | 26 | 27 |
| 28 | 29 | 30 | 31 | |||
