Pants & more
In the afternoon, I was in the home shop: deburred and primed the wing root fairings, along with all the brackets for the wheelpants. Located and packed up more things I would need at the hangar to work on the wheelpants.
Evening brought a trip to the hangar. Installed the rubber seal on the wing root fairings. Managed to get the main gear wheelpant brackets installed. Drilled & cut the slots in the nosegear pant brackets, but need to bring a larger hex wrench to remove the towbar bolts, as they are what hold the brackets on. Countersunk and installed a flush hex bolt for the nosewheel axle retainer.
Removed the seats and floor panels to be ready for a preinspection tomorrow.
Hours: 5.8 | Posted in Endgame, Gear & Fairings | Comments Off