Inspection pending
I heard back from the DAR today…the inspection is officially scheduled for 8:30 Friday morning.
Just a couple things to wrap up before then: I need to remove the spinner, retorque the prop bolts, and add some grease to the nosegear pivot. Also, make the final entries in the engine & airframe logbooks.
I also want to test the comm radio, but that may not happen until later, since I know the radio doesn’t work well inside the hangar with its double-layer metal walls. And, I’ll load the checklists into the EFIS when I have them finished.
Insurance needs to be finalized, first flight still to be set up, and 3 more hours of transition training — but we’re getting close…