A’cowling we will go
Sanded the rear edge split lines of the cowling to provide an even 1/16″ gap to allow for paint. Sanded the gearleg cutout to center the leg, by widening it to one side & straightening the lines.
Rolled on a layer of slightly thinned epoxy, then later in the day, a squeegeed second layer. It’ll get another layer in the morning, then allowed to fully cure before sanding.
Spent a bunch of time wrestling with adel clamps in the process of installing a metal piece for the last 16″ or so of the breather tube. The end of the tube is cut to align against the left exhaust pipe.
Hours: 5.0 | Posted in Cowling & Baffles, Engine | Comments Off