3rd
July
2010
More roll bar fabrication, primer prep
Finished fabrication of the roll bar by drilling the forward channel to the join strips, then took it apart for deburring. Etched the pieces of the roll bar assembly, along with some other parts collected over the last couple weeks (boost pump doghouse, brake bracket, etc.)
Hours: 4.5 | Posted in Cabin & Interior | Comments Off