3rd July 2010

More roll bar fabrication, primer prep

Hours: 4.5 | Posted in Cabin & Interior

Finished fabrication of the roll bar by drilling the forward channel to the join strips, then took it apart for deburring.  Etched the pieces of the roll bar assembly, along with some other parts collected over the last couple weeks (boost pump doghouse, brake bracket, etc.)

Prepared to drill forward channel Forward splice plate drilled Roll bar drilled

Comments are closed.