25th April 2009

Leading edge two

Jacked up the right wing, measured and tweaked the fixture, then clecoed the leading edge assembly in place.  More measureing and checking, then riveted the rib-spar rivets, as on the left wing.  All came out fine, only had to drill two.  Allison did a great job driving the rivets on the two-man rib (third inboard).

Hours: 1.7 | Posted in Skin Panels | Comments Off