25th
April
2009
Leading edge two
Hours: 1.7 | Posted in Skin PanelsJacked up the right wing, measured and tweaked the fixture, then clecoed the leading edge assembly in place. More measureing and checking, then riveted the rib-spar rivets, as on the left wing. All came out fine, only had to drill two. Allison did a great job driving the rivets on the two-man rib (third inboard).