25th April 2009

Leading edge two

Hours: 1.7 | Posted in Skin Panels

Jacked up the right wing, measured and tweaked the fixture, then clecoed the leading edge assembly in place.  More measureing and checking, then riveted the rib-spar rivets, as on the left wing.  All came out fine, only had to drill two.  Allison did a great job driving the rivets on the two-man rib (third inboard).

Comments are closed.