2nd
September
2007
R Elev primer prep
Primer prep on the right elevator parts: etch, scrub, rinse, repeat. Set everything on the rack in the shop to dry out before priming.
Hours: 1.3 | Posted in Elevators | Comments Off
Primer prep on the right elevator parts: etch, scrub, rinse, repeat. Set everything on the rack in the shop to dry out before priming.
Hours: 1.3 | Posted in Elevators | Comments Off
S | M | T | W | T | F | S |
---|---|---|---|---|---|---|
« Aug | Nov » | |||||
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 |