2nd
September
2007
R Elev primer prep
Hours: 1.3 | Posted in ElevatorsPrimer prep on the right elevator parts: etch, scrub, rinse, repeat. Set everything on the rack in the shop to dry out before priming.
Primer prep on the right elevator parts: etch, scrub, rinse, repeat. Set everything on the rack in the shop to dry out before priming.
S | M | T | W | T | F | S |
---|---|---|---|---|---|---|
« Nov | ||||||
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 |