2nd
September
2007
R Elev primer prep
Hours: 1.3 | Posted in ElevatorsPrimer prep on the right elevator parts: etch, scrub, rinse, repeat. Set everything on the rack in the shop to dry out before priming.
Primer prep on the right elevator parts: etch, scrub, rinse, repeat. Set everything on the rack in the shop to dry out before priming.
S | M | T | W | T | F | S |
---|---|---|---|---|---|---|
« Nov | ||||||
1 | 2 | |||||
3 | 4 | 5 | 6 | 7 | 8 | 9 |
10 | 11 | 12 | 13 | 14 | 15 | 16 |
17 | 18 | 19 | 20 | 21 | 22 | 23 |
24 | 25 | 26 | 27 | 28 | 29 | 30 |