28th September 2009

Fuselage begins

Hours: 1.2 | Posted in Bulkheads

Started to putz with the fuselage by laying out the firewall and clecoing the various angles, stiffeners, and such in place.  Some searching was necessary to find all the little bits, and I’ll have some doublers, angles, and reinforcing plates to fabricate.  I’m thinking that I will install the fuel pump doubler plate, even though I plan an injected engine–one can never tell what the future might hold, so best to be prepared.

Comments are closed.