27th August 2009

Right flap drilled

Hours: 1.5 | Posted in Flaps

Drilled the right flap: nose skins, top skin, and spar.  Also attached and drilled the inboard reinforcement plate, and the nutplate which attaches the actuator arm.  Disassembled the flap in preparation for deburring.

Right flap drilled Right flap inboard bracket Actuator nutplate Right flap parts disassembled

Comments are closed.