Leading edge work
Hours: 6.6 | Posted in Skin PanelsToday’s task: prep leading edges for primer. Disassembled both LE’s, deburred, scuffed rivet lines, and dimpled. Drilled the splice strip for platenuts, and also finished deburring the landing light internal pieces; all the LE components are ready to be etched & primed.
In between deburring tasks, I also bolted & torqued the tiedown brackets to the spars. Bellcrack brackets are hung loosely with their bolts, awaiting installation of the bellcranks.
Received the missing F-902-L this week, along with a replacement for the gouged up piece of bar stock.