30th December 2008

Primer prep

Hours: 4.9 | Posted in Spars & Skeleton

Long session of rib prep…finished drilling, deburring, and etching/scrubbing all the remaining wing ribs for both wings.  Bought some plastic yesterday to hang up for a priming area; with that, and some large cardboard leftover from a fridge box, ought to be able to kludge something up and move on to priming and assembly, assuming the primer will dry in the cool shop temps.  Wing jigs are on the horizon for later this week, so started to shuffle the shop around to see where they’ll fit.  I need to build some shelves and get things off the floor on the east side, as well.

Comments are closed.