Cowling & FWF
Hours: 4.0 | Posted in Cowling & BafflesA bit of FWF work: installed adel clamps for the oil and manifold pressure lines, and looked at possible clamping locations for the fuel line to the spider.
Finished the preliminary work on the camloc strips for the upper cowling: trimming to length, completed drilling to the firewall, transferred the layout lines for the camlocs, and drilled for the camlocs with the first template (3x #30 holes). Clecoed the strips back on, and set the upper canopy in place. Marked a rough trim line that just clears the clecos, and cut with the oscillating saw. More fitting will be required, of course.
Stopped by the airport while out and about today and picked up a possible lead on a hangar space.