9th May 2010

Priming, brake pedals

Hours: 4.0 | Posted in Upper Fuse & Skins

Sprayed primer and final color on the pile of parts which were etched yesterday.

After they had set up, I squeezed the rivets on the brake pedal assemblies and bolted the pedals to the angle pieces.  I think they turned out nicely.  The paint thickness added enough to the assembly that I had to turn down the outer flange of the bushings I installed on the pedals…I finished the pilot side before it was time to wrap up.

Need to order those longer bolts for the left step bearing block, so I can get that in and not hold up the baggage floor installation.

Comments are closed.