8th May 2010

Primer prep

Hours: 2.2 | Posted in Upper Fuse & Skins

Etched a small pile of parts in preparation for priming: baggage floors, shoulder harness brackets, upper firewall/longeron gussets, brake pedals, pitch servo bracket, step doublers, aft deck and spacers.

Sprayed the front side of the brake pedals with final color paint (a sand-colored textured Rustoleum rattle can).

Comments are closed.