8th
May
2010
Primer prep
Hours: 2.2 | Posted in Upper Fuse & SkinsEtched a small pile of parts in preparation for priming: baggage floors, shoulder harness brackets, upper firewall/longeron gussets, brake pedals, pitch servo bracket, step doublers, aft deck and spacers.
Sprayed the front side of the brake pedals with final color paint (a sand-colored textured Rustoleum rattle can).