22nd November 2009

Assorted bulkheads

Hours: 3.3 | Posted in Bulkheads

Working aft on the bulkheads, spend time fluting, match-drilling, and fabricating bulkhead components.   Marked and drilled all the holes for rudder cable and wiring bushings, cut and filed the areas to be trimmed from the 711 bulkheads, dimpled the flush rivet holes on the aftmost bulkhead.  Cut the angles that reinforce the elevator bellcrank area and drilled the lower one to the channel.

Stack of aft bulkheads Bellcrank area

Comments are closed.