11th
August
2010
Prep, prime, paint
The three P’s of almost-ready-to-assemble-something. Etched the remainder of the canopy frame parts, then primed, and painted the visible surfaces.
Hours: 3.4 | Posted in Canopy & Frame | Comments Off